CAPACITY OF MAJOR SHOP EQUIPMENT (FIELD EQUIPMENT NOT INCLUDED)
CRANES
1 - 50 ton Bridge 30'-0" under hook
2 - 10 ton Bridge 25'-0" under hook
1 - 25 ton Mobil Gantry (straddle) 20'-0" under hook
1 - 14 ton Mobil Hydro 60'-0" Boom
PLATE ROLLS
3/8" Capacity X 8'-0" wide 10" min. I.D. (Initial)
3/4" Capacity X 12'-0" wide 20" min. I.D. (Pyramid)
1 1/4" Capacity X 10'-0" wide 20" min. I.D. (Initial)
BRAKE PRESS
320 Ton
Capacity: 3/8" X 12'-0", 1/2" X 10'-0", 3/4" X 8'-0"
MULTIPLE TORCH BED
10'-0" X 50'-0"
DRILL PRESS
5'-0" Radial Arm
VERTICAL BORING MILL
45" max. swing
TANK TURNING ROLLS
20 Sets - Power Driven
Largest Capacity Single Drives Sets - 100 Ton
AIR COMPRESSORS, STATIONARY
25HP, 2 Stage, Air-Cooled, 115 CFM
50HP, Curtis R/S 50, 209 CFM
600 CFM, I.R. Diesel, 1RDR - 600
PLASMA EQUIPMENT
Thermal Arc Pak 10, capacity 1" thick
Thermal Arc Pak 10XL, capacity 1 1/4" thick
Thermal Arc Pak 45, capacity 3" thick
CODE STAMPS
ASME: U, S, R, and H
State of Illinois Pressure Vessel and Boiler Stamp No. 010
LABEL SERVICES
API
NON-DESTRUCTIVE TESTING
Radiographic Examination, Magnetic Particle and Ultrasonic Testing
is performed by outside professional agency.
Liquid Penetrate Inspection Equipment (In house)
PRESSURE TESTING
Hydrostatic Testing Medium: Water - Max 10,000 PSI
Air Description Method: Soapy Water
INSPECTION AGENCY EMPLOYED TO PERFORM CODE INSPECTION
Hartford Steam Boiler Insurance and Inspection Agency
UNION AFFILIATIONS OF COMPANY
Shop: Boilermakers Local #1
Field: AFL - CIO Boilermakers and Iron Workers
QUALITY CONTROL SYSTEMS
We have a fully audited quality control program covering both shop and field operations
SHIPPING CAPABILITIES
Rail:
Indiana Harbor Belt Railroad (Part of New York Central System) siding into new shop, north bay.
Barge: By Inquiry
Truck: By Inquiry
MATERIAL THICKNESS QUALIFICATIONS
2 1/2" Maximum - 16Ga. Minimum